This week has been one of the best weeks of my life. I have found a great internship and could not be happier with how everything is going. This week I learned how to checkin and perform maintenance on light towers that are powered by 3 cylinder diesel engines. I also got checked in on being able to use and operate forklifts, boom lifts, scissor lifts and tow behind lifts. So far this week I have checked in roughly 12 light towers and about 10 air hammers/ rivet busters. I have learned an amazing amount of information having to do with how shops work and how to properly get things done. I am learning so much!
40hrs
Saturday, June 23, 2012
Thursday, June 14, 2012
Auh. My first week on the job and a great start to the summer of 2012!
This was one of the best weeks of my life so far. I started my new internship at Birch Equipment. I have already learned so much and I can't wait for more. I learned a lot about diagnosing and understanding hydraulics on Thursday. I got to help out on a pile driver that we were fitting tk one of our excavators. I learned how to properly size and crimp hydraulic hoses to make custom new ones. I also learned a little bit more about batteries and the purpose of a 48V system instead of a 12V system. I am having the time of my life and I can't wait for next week.
Check out my facebook for a video I took today on the pile driver.
Www.facebook.com/quinn.bune
June 12-14. 25 hrs
Check out my facebook for a video I took today on the pile driver.
Www.facebook.com/quinn.bune
June 12-14. 25 hrs
Monday, June 11, 2012
June 11, 2012: First day on the job!
Today was my first day with Birch Equipment. What a day. Couldn't be happier. I started to understand the inspections, what to look for, what might cause failure in the future and to notice everything and don't think something is to small to worry about. I learned a lot and can't wait for what tomorrow holds.
9 hrs
9 hrs
June 7, 2012: Diesel power!!!
Today I performed a transmission removal on the eaton fuller super 10 from the kenworth on the floor. We also had our end of the year BBQ. pretty fun if I do say so myself. One of the things I learned today that I will take away is the pumps make flow, not pressure that's what demand for power does or restriction. Another quality day at school!
8hrs
8hrs
Thursday, June 7, 2012
June 6, 2012: the very interesting double clutch?...
Today I finally was able to snag the flow tester so I could preform a flow test on the power steering pump. The actual test takes about 10 minutes but finding the right fittings and installing it is another story. Haha. I also took the double clutch off of the cummins straight six on the stand on the floor. Very cool to see how much it is the same to a regular single clutch setup only a bit larger and a few more pieces. While the clutch assembly was open I performed a flywheel runout test with the dial indicator. We also took out the pilot bearing to check it.
8hrs
8hrs
Tuesday, June 5, 2012
June 5, 2012: how 5th wheels and double clutches work
Today I took take apart two different brands of 5th wheel and learned how the same job is done two completely different ways. I also took apart a double clutch assembly. Very interesting. I had just started yesterday to understand how a clutch works and a double clutch is just a few more pieces but same principal. Everything seems to be clicking!
7 hrs
7 hrs
Subscribe to: